<sub id="u7b13"><p id="u7b13"></p></sub>
    <p id="u7b13"><menu id="u7b13"></menu></p>
    <p id="u7b13"></p>
      <cite id="u7b13"></cite>

        久久精品夜色国产亚洲av,色狠狠综合天天综合综合,四虎国产精品成人免费久久,亚洲自拍偷拍福利小视频,一区二区三区黄色一级片,国产精品自拍一二三四区,国产在线视频不卡一区二区,91久久亚洲综合精品成人
        Hotline:400-880-1556

        English




        [Focus] Requirements and content of the new version of IEC 62619:2022, the energy storage battery standard

        Author:中認聯科 time:2022-08-09 Ctr:2806

        IEC Battery Technical Committee TC 21/SC 21A published the second edition of IEC 62619:2022 on 24 May 2022. Compared with the 2017 version, the detailed changes in the new version are shown in the table below. For changes to the new version, manufacturers need to pay special attention to the following changes, which need to be considered in the early design and development process:

        1. New requirements for moving parts;

        2. Additional hazardous live parts requirements;

        3. Additional battery system design requirements;

        4. Added system lock requirements;

        5. New EMC requirements;

        6. Additional laser triggers the spreading process.

        What's new in the new version

        新版新增.png 

        Modified content of the new version

        新版修改.png 

        The new version deletes the content

        新版刪除.png 

        Laser Triggered Spreading Process

        1. Cell preparation test

        (1) Fully charge the battery according to the method specified by the manufacturer

        (2) Place a thermocouple on the surface of the cell

        (3) Fixed cell

        (4) Determine the laser irradiation plan

        (5) Prepare equipment such as cell temperature measurement

        (6) Set the ambient temperature to 25℃±5℃

        (7) Irradiate the battery with a laser at a certain point and measure the temperature of the battery until the end of the observation

        (8) Turn off the laser when it is observed that the temperature rises rapidly due to the thermal runaway of the cell

        (9) Continue to observe the cell temperature and appearance until the temperature drops to a safe operating range

        (10) View temperature curve to confirm thermal runaway

        (11) The cell prediction shall be repeated 3 times, and if thermal runaway is confirmed in each test under the same conditions, the battery system spread test shall be carried out under the same irradiation conditions

        2. Battery system test

        (1) Fully charge the battery system according to the manufacturer's recommended conditions

        (2) Place a thermocouple on the surface of the cell

        (3) Fix the battery system on the test bench, and the irradiation point on the target cell should be the same or similar to that of the preliminary test

        (4) Prepare and set up equipment for battery system temperature test etc.

        (5) Determine the laser irradiation plan

        (6) Set the ambient temperature to 25 ℃ ± 5 ℃

        (7) Irradiate the target cell with a laser at a certain point and continuously measure the temperature of the monitored cell

        (8) When it is observed that the temperature rises rapidly due to the thermal runaway of the cell, turn off the laser

        (9) Observe and measure the cell temperature and the appearance of the battery system for at least 1 hour

        Warm Tips

        IEC 62619 is a safety standard for lithium secondary batteries used in industrial products. It is cited by power storage systems in many countries and regions and is the basic standard for battery systems in power storage system certification. If you want to know more about the requirements for battery product testing and certification or have battery products that need to be tested and certified, please feel free to contact us, our engineers will serve you as soon as possible!

        Related Articles
        • Don't let KC certification hold you back! ZRLK teaches you to get your certificate efficiently

        • Eu RHOS Certification: The "Green Pass" for Enterprises to Export to the EU

        • Energy conservation and compliance both online! Analysis of the Practical Value of CEC Certification

        • A Comprehensive Guide to DOE Certification: What's the First Step to Compliance When Exporting Electronic and Electrical Appliances to the United States?

        Follow Us
        主站蜘蛛池模板: 亚洲熟女乱色综合一区| 韩国无码AV片在线观看网站| 激情综合网激情国产av| 欧美区一区二区三区| 色宅男看片午夜大片啪啪| 在线看av一区二区三区 | 中文字幕日韩一区二区不卡| 久久五月丁香激情综合| 蜜桃av亚洲第一区二区| 8AV国产精品爽爽ⅤA在线观看| 亚洲高清aⅴ日本欧美视频| 午夜福利啪啪片| 色综合视频一区二区三区| 色欲综合久久中文字幕网| 涩涩爱狼人亚洲一区在线| 精品无码国产日韩制服丝袜| 亚洲av成人一区在线| 18禁免费无码无遮挡网站| 国产一级精品毛片基地| 国产成人99亚洲综合精品| 国产超碰无码最新上传| 中文字幕乱码十国产乱码| 临江市| 四虎永久在线精品免费看| 久久亚洲精品中文字幕| 亚洲一品道一区二区三区| 免费AV片在线观看网址| 亚洲色大成网站WWW尤物| 亚洲天堂一区二区三区三州| 麻豆国产成人AV在线播放| 国产精品国产三级国产午| 99久久99这里只有免费费精品| 久久精品国产中文字幕| 少妇av一区二区三区无码| 99久久99久久精品免费看蜜桃| 国产果冻豆传媒麻婆精东| 国产无套内射又大又猛又粗又爽 | 精品国产一区二区三区久| 人妻蜜臀久久av不卡| 国产亚洲一二三区精品| 国内久久人妻风流av免费|